Understand
Review the environment, required capacity, locations and operational constraints.
Home / Insights / Datagraphic fibre backbone
Case study · Networking
Selected Cyber planned and delivered a high-capacity network backbone for Datagraphic, combining careful coordination, reliable installation and one accountable relationship from start to handover.
The requirement
The network needed to support future growth while being delivered around a working business environment.
A project of this scale is not only about the fibre itself. Routes, dependencies, access, disruption and handover all need to be considered together.
Selected Cyber provided one point of coordination across the project, turning the technical requirement into a practical delivery plan.
The delivery
Each stage was shaped around reliability, clear responsibility and minimal disruption.
Review the environment, required capacity, locations and operational constraints.
Develop sensible routes and coordinate the installation around the live site.
Deliver approximately 1,200 metres of fibre with the supporting network infrastructure.
Confirm the completed backbone and leave the customer with a clear foundation for growth.
The outcome
The completed 100Gb backbone gives Datagraphic the capacity and resilience to support continued operational and technology growth.
A high-capacity backbone designed around future demand rather than only today’s requirement.
Clear coordination from early planning through installation and final handover.
A practical delivery approach shaped around a live operational environment.
Planning a network project?
We can help turn a complex connectivity requirement into a clear, practical project.